Live GMP Logo
Akanksha Power and Infrastructure ltd

Akanksha Power and Infrastructure ltd

smelisted
Registrar: LINK in TIME · Listing 2024-01-03
IPO Timeline
Today · 20 Oct 2026
Opens
27 Dec 2023
Closes
29 Dec 2023
Allotment
29 Dec 2023
Refund
02 Jan 2024
Demat
01 Jan 2024
Listing
03 Jan 2024
Price Band
₹52–55
GMP
₹0
0%
Lot Size
2000 Shares
Min ₹110,000
Subscription
0x
Issue Size
₹27.49 Cr
Open
2023-12-27
Close
2023-12-29
Listing
2024-01-03

About the company

## **About  Akanksha Power and Infrastructure ltd** In 2008, Akanksha emerged with a mission to redefine the power solutions landscape, pledging to deliver sustainable and reliable energy solutions to its diverse clientele. With over a decade of unwavering commitment, the company has evolved into a prominent player in the manufacturing of electric equipment, specializing in electrical panels, instrument transformers, and vacuum contactors. Akanksha's offerings cater to a broad spectrum of consumers, ranging from institutions and industries to electricity transmission and distribution utilities. Manufacturing Excellence: Precision, Quality, and Performance Akanksha takes pride in its state-of-the-art manufacturing facilities, strategically located across two sites. These facilities are meticulously designed to uphold the highest standards of quality and performance in the production of electrical equipment. The company's dedication to excellence ensures that each product leaving its assembly lines meets stringent quality benchmarks. Comprehensive Services: Beyond Manufacturing Beyond manufacturing, Akanksha extends its expertise to comprehensive services related to the distribution and management of electricity. The company plays a pivotal role in establishing robust electrical infrastructure, offering services such as power quality audits, site analysis, and online cloud-based monitoring. This approach enables better management and aids in minimizing losses at the transmission, distribution, and user levels. Innovation in Action: Cloud-Based Monitoring and Data Analysis At Akanksha, innovation is not just a buzzword but a cornerstone of operations. The integration of online cloud-based monitoring stands as a testament to the company's forward-thinking approach. Through sophisticated data analysis, Akanksha empowers its clients with actionable insights, contributing to more efficient and effective management of electrical systems. Empowering DISCOMs: Managing Electrical Distribution Networks Akanksha plays a vital role in supporting distribution companies (DISCOMs) by efficiently managing electrical distribution networks. The company's expertise extends to optimizing operations, reducing losses, and enhancing overall network efficiency for DISCOMs. Forward Momentum: A Vision for the Future As Akanksha continues to evolve and expand its horizons, the commitment to providing sustainable and reliable power solutions remains unwavering. The company envisions a future where its innovative approach and commitment to quality contribute significantly to the advancement of the power industry. As Akanksha Power and Infrastructure Limited prepares for its Initial Public Offering (IPO), the proceeds generated from the Fresh Issue will be allocated towards crucial objectives: 1. Capital Expenditure Requirement of Company; 1. Working Capital requirements of the Company; 1. General Corporate Purposes; and 1. Issue Expenses Here are key details about the Akanksha Power and Infrastructure ltd IPO: Company Name| **Akanksha Power and Infrastructure ltd Limited**|  | Akanksha Power and Infrastructure ltd IPO Opening Date| **December 27, 2023** ---|---|---|---|--- Company Established On|**2008**Akanksha Power and Infrastructure ltd IPO Price band|**₹52 to ₹55 per share**

Strengths

    Risks

      Financial performance (₹ Cr)

      IPO Roadmap / Timeline

      Current Status · as of 20 Oct 2026
      Listed
      Listed on 03 Jan 2024
      Listed 1021 days ago
      1. IPO Opens

        Completed
        27 Dec 2023

        Bidding starts for all investor categories

      2. IPO Closes

        Completed
        29 Dec 2023

        Last day to place your bid

      3. Basis of Allotment

        Completed
        29 Dec 2023

        Share allotment finalised

      4. Refund Initiation

        Completed
        02 Jan 2024

        Refunds credited for non-allottees

      5. Credit to Demat

        Completed
        01 Jan 2024

        Allotted shares credited to demat account

      6. Listing on Exchange

        Completed
        03 Jan 2024

        Shares list on NSE / BSE

      Post-close dates are indicative as per SEBI T+3 listing framework and may change per registrar updates.

      Lot size & minimum investment

      Lot Size
      2000 shares
      Price / Share (upper)
      ₹55
      Min Investment (1 lot)
      ₹110,000
      Price Band
      ₹52–55
      Retail / Individual
      1 lot only
      Min lots
      1
      Min shares
      2000
      Min amount
      ₹110,000
      Max amount
      ₹110,000
      HNI
      Min 2 lots
      Min lots
      2
      Min shares
      4000
      Min amount
      ₹220,000
      Max amount
      ₹220,000

      Shares reserved per category & allotment probability

      QIB
      100% allotment
      Reservation
      50%
      Amount
      ₹13.75 Cr
      Shares offered
      2,569,159
      Shares bid
      0
      Subscribed
      0.00x
      NII
      100% allotment
      Reservation
      15%
      Amount
      ₹4.12 Cr
      Shares offered
      770,748
      Shares bid
      0
      Subscribed
      0.00x
      Retail
      100% allotment
      Reservation
      35%
      Amount
      ₹9.62 Cr
      Shares offered
      1,798,411
      Shares bid
      0
      Subscribed
      0.00x

      Retail is a lottery-based allotment when oversubscribed; QIB/NII get pro-rata. Probability ≈ 1 / subscription times (100% if under-subscribed).